Overview
AMSA Marine Notice 2026/01 highlights concern over the inappropriate use of statutory certificate extensions, clarifies Australia’s approach to such extensions, and outlines the Port State Control (PSC) actions that may be taken where an extension is found to be inconsistent with applicable Convention requirements.
TOKYO MOU Safety Bulletin 05/2026 - Improper Extensions of Statutory Certification draws attention to extensions of statutory certificates that contradict Convention requirements.
Key Requirements
SOLAS Ch. I/Reg. 14(e) and IMO circular MSC-MEPC.5/Circ.1 provide requirements and recommendations to Administrations on certificate extensions.
Key Requirements and Guidance/Extension Provisions and Guidance
- No certificate shall be extended for more than three months (+3M)
- Concurrence from flag Administration needs to be sought for extensions
According to IMO circular MSC-MEPC.5/Circ.1, if a ship is in a port where the required survey cannot be completed, and where the Convention allows the Administration to extend the certificate, the Administration should be guided by the following:
- An additional survey, equivalent to at least the scope of an annual survey required by the relevant certificate(s), should be carried out;
- If a renewal survey is due, it should be progressed to the maximum extent possible;
- In cases where a dry docking is required but cannot be carried out, an underwater inspection of the ship’s bottom should be carried out;
- In cases where an underwater inspection is not possible (e.g., poor water visibility, draft restrictions, excessive current, refusal by the port authority), an internal inspection of the ship’s bottom structure, to the maximum extent practicable, should be carried out;
- The ship should be allowed to sail directly to a named final agreed cargo discharge port and then directly to a named agreed port to complete the survey and/or dry docking;
- The extension period should be for the minimum amount of time needed to complete the survey and/or dry docking under the relevant certificate(s);
- The condition of the ship found by the surveys indicated above should be considered in determining the duration, distance and operational restrictions, if any, of the voyage needed to complete the survey and/or dry docking; and
- The extension period of the relevant statutory certificate(s) should not exceed the period of validity of the certificate which may be issued to document compliance with the structural, mechanical and electrical requirements of the recognized classification society.
IMO Resolution A.1207(34), section 5.9, sets out recommended conditions for extending the validity of a certificate. Where the applicable Convention permits an extension and it is considered proper and reasonable, the Administration should be guided by these conditions, including that the ship should sail directly to the named final agreed cargo discharge port and then directly to the named agreed port for survey and/or dry docking.
Flag State Marine Notices
Several flag States have issued marine notices on certificate extensions (see page 2 of ABS Regulatory News). Flag State approval of an extension does not preclude independent PSC assessment. Port State authorities may examine whether both the extension and the ship’s subsequent operation remain consistent with the applicable Convention or Code requirements. The flag State notices illustrate the different administrative approaches to extension requests.
PSC Regimes Findings
AMSA reports that Australian Port State Control Officers (PSCOs) are finding ships whose statutory certificates have been extended under SOLAS Chapter I, Regulation 14(e) or (f), but which continue to trade commercially rather than proceeding directly to the port of survey. They have also observed ships issued three-month extensions that continue, or intend to continue, commercial trading during that period.
PSCOs notes that these ships may:
- not undertake a direct voyage to their named cargo discharge and/or survey port;
- have extensions for more than the minimum amount of time needed to complete the survey; and
- require dry docking as part of their survey
AMSA Marine Notice and Tokyo MOU Bulletin Highlights
A ship with an extension found to be contrary to the Convention or Code requirements may be detained during a PSC inspection. Depending on the circumstances and the applicable procedures, the ship may be allowed to sail under detention to the survey port.
Recommendations
Owners and operators considering an extension should engage the issuing recognized organization (RO) and flag Administration early, allowing time to review the Convention basis, intended voyage and survey arrangements. The application and any approval should be specific to the ship and the circumstances, rather than treated as a general extension of trading time.
- Identify the applicable Convention or Code provision and explain why the request is proper and reasonable.
- Record the agreed final discharge and survey or dry-docking ports, and plan the direct voyage described in the approval.
- Request a period tied to the time reasonably needed for that voyage and survey, rather than assuming the maximum available period will apply.
- Check that the RO submission and flag State decision consistently describe the ports, timing and any operating conditions.
- If operating in or calling at Australian or other Tokyo MOU ports during a certificate extension period, pay particular attention to AMSA Marine Notice 2026/01 and Tokyo MOU Safety Bulletin 05/2026 and ensure that the extension and subsequent voyage remain consistent with the applicable Convention or Code requirements, including the agreed voyage, survey arrangements and extension period.